Current Plumbing Projects


800 5th

— Lower Queen Anne, Seattle, WA
Architect: S+H Works
GC: Blueprint Capital
Year Completed: Currently Under Construction
Living Units: 63 SEDU Apartments
Building Type: Multi-Family Mixed Use Apartment Building

800 5th is located at the base of Queen Anne hill. The units are classified as Small Efficiency Dwelling Units, which makes it ideal for efficient housing. Structure consists of three levels of wood framing over a single level of concrete structure. Building includes retail areas, a spacious rooftop lounge with kitchen, live/work units and generous bike storage. OWP is responsible for design and installation of all plumbing systems, including high-efficiency water heaters and re-circulating hot water system.

800 and 5th Apartments Seattle



Howell

— Capitol Hill, Seattle, WA
Architect: S+H Works
GC: Blueprint Capital
Year Completed: Currently Under Construction
Living Units: 76 SEDU Apartments
Building Type: Multi-Family Mixed Use Apartment Building

The Howell project is a 7-story mixed use apartment building with Small Efficiency Dwelling Units and a retail/restaurant area at street level. Structure consists of three levels of concrete decks with four levels of wood framing above. OWP is responsible for design and installation of all plumbing systems, including high-efficiency water heaters, re-circulating hot water system and duplex water pressure booster pump.

Howell Apartments Capitol Hill Seattle



Acme Farms

— International District, Seattle, WA
Architect: Tiscareno Associates P.S.
GC: Exxel Pacific, Inc.
Year Completed: Currently Under Construction
Living Units: 321 Apartments
Building Type: Multi-Family Mixed Use Apartment Building

Acme Farms is located in the heart of the bustling International District and includes several large retail and restaurant areas situated next to an outdoor courtyard area. Building includes several amenities such as a courtyards, fitness area and top floor lounge. The structure consists of three levels of concrete and five levels of wood-framing. OWP is responsible for design and installation of all plumbing systems within the building.

Acme Farms Apartments Seattle



Spuds Greenlake

— Greenlake, Seattle, WA
Architect: Cone Architecture
GC: Blueprint Capital
Year Completed: Currently Under Construction
Living Units: 61 SEDU Apartments
Building Type: Multi-Family Apartment Building

This project will replace the old Spuds restaurant along the shores of Greenlake. Apartments will be Small Efficiency Dwelling Units. OWP is responsible for design and installation of all plumbing systems, including high-efficiency water heaters and re-circulating hot water system.

Spuds Greenlake Apartments Seattle



Meeker Apartments

— Kent, WA
Architect: Studio Meng Strazzara
GC: Goodman Real Estate
Year Completed: Currently Under Construction
Living Units: 365 Apartments
Building Type: Mid-Rise Towers & Community Building

Meeker includes two garden-style walkup buildings, three mid-rise towers and one community amenity and leasing building. Each walkup building has three wood-framed levels, while the mid-rise towers include three levels of wood framing over a concrete garage. Individual water heaters are used in each unit. OWP is responsible for design and installation of all plumbing and gas systems.

Meeker Apartments Kent



Marina Square

— Bremerton, WA
Architect: Encore Architects
GC: Compass Construction
Year Completed: Currently Under Construction
Living Units: 141 Hotel Units & 129 Apartments (270 total units)
Building Type: Hotel & Mixed-Use Apartment Building

Marina Square overlooks the Bremerton Marina and USS Turner Joy along the Bremerton Boardwalk. It has two towers; one being a hotel, and the other an apartment building. The structure consists of five levels wood framing over four levels of concrete. Each building includes its own separate boiler room system, hot water circulation system pressure booster system. OWP is responsible for design and installation of all plumbing systems.

Marina Square Bremerton



Columbia City

— Columbia City, Seattle, WA
Architect: Johnston Architects
GC: Exxel Pacific, Inc.
Year Completed: Currently Under Construction
Living Units: 242 Apartments
Building Type: Multi-Family Mixed Use Apartment Building

Columbia City has five levels of wood framed units over three levels of concrete parking, retail and lobby areas. Amenity areas include a large courtyard deck with fireplaces and barbecues, as well as a rooftop lounge area. OWP is responsible for design and installation of all plumbing systems including a high-efficiency central hot water heating room, re-circulating hot water system and duplex water.

Columbia City Apartments Seattle



206 Place

— International District, Seattle, WA
Architect: Hewitt
GC: Marpac Construction
Year Completed: Currently Under Construction
Living Units: 65 Condos
Building Type: Multi-Family Condo Building

206 Place has five levels of wood framed units over three levels of concrete structure. All units are single bedroom, single bath, with no parking. The street level includes a commercial tenant space and amenity area, lobby and bike storage. The roof includes an amenity deck with firepit and BBQ. OWP is responsible for design and installation of all plumbing systems including a high-efficiency central hot water heating room, re-circulating hot water system and duplex water pressure booster pump.

206 Place Condos Seattle



Aria Flats

— Redmond, WA
Architect: Encore Architects
GC: Compass Construction
Year Completed: Currently Under Construction
Living Units: 102 Apartments
Building Type: Multi-Family Mixed Use Apartment Building

Aria Flats is across the street from Anderson Park in Redmond. These building will have two retail areas, loft-style units at roof level, a lounge and amenity spaces. OWP is responsible for design and installation of all plumbing systems including a high-efficiency central hot water heating room, re-circulating hot water system and duplex water pressure booster pump.

Aria Flats Apartments Redmond




Plumbing Services
Plumbing Services

Completed Projects
Completed Projects

Current Projects
Current Projects


Proudly Serving:

The Greater Seattle Areas Including Everett, Kirkland, Snohomish, Bellevue, Redmond and Tacoma


Home | Plumbing Services | Completed Projects | Current Projects | Employment | About Us | Contact Us | Privacy Policy | Sitemap
One Way Plumbing LLC | 127 10th Street South, Suite 200 - Kirkland, WA 98033 | Call: 425-968-8314
© 2020 One Way Plumbing LLC
Website By All Seattle Web Design